
Due to client NDA commitments, the showcased projects represent only a portion of our work and not the full scope of what we've delivered.
The brief, and the constraint.
The client needed chilled water piping design for a high-tech campus in Saudi Arabia, balanced for minimum pressure drop across long distribution runs and coordinated with structural and electrical trades.
How we engineered it.
We sized CHW mains and branches in HAP and Revit MEP, ran pressure drop optimization against ASHRAE 90.1 limits, and coordinated the routed model with structural and electrical disciplines for clash-free issue.
What shipped.
Pressure drop was minimized across the distribution network and the system was issued for construction within schedule, with the coordinated model passing clash review on the first pass.
Drawings & renders.



Deliverables
- HVAC design report
- Load calculation sheets (HAP)
- CHW pipe sizing drawings
- Equipment schedule
- Coordinated Revit model
- Compliance summary
Tools & Codes
“Long CHW distribution runs punish you on pump energy for the life of the building. Pressure-drop optimization up front is the cheapest kWh you will ever save the client.”- Lead Engineer, Fluxiss
Let's Build Something Great Together.
Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.