Structural Analysis of a Power Plant Main Boiler Stack

Structural Analysis of a Power Plant Main Boiler Stack

Farooqabad, Pakistan

Project Lead
Syed Nasir
Lead Consultant, Founder & CEO, Fluxiss
Discuss a similar project

Static and dynamic structural analysis of the main boiler stack at Saba Power Plant, Farooqabad, to AISC, with stress analysis of the stack piping.

Challenge

Saba Power Company needed the integrity of the main boiler stack at its Farooqabad plant verified. Fluxiss carried out this work as engineering subcontractor.

Approach

Fluxiss analysed the stack under static and dynamic loads in STAAD.Pro to AISC, and analysed the boiler stack piping in CAESAR II to ASME B31.3.

Result

Stack integrity was checked under static and dynamic load analysis, along with the associated piping.

Scope of Work

  • Static and dynamic stack analysis
  • Stack piping stress analysis

Deliverables

  • Structural analysis report
  • Piping stress analysis

Codes & Tools

AISCASME B31.3STAAD.ProCAESAR II