
Structural Analysis of a Power Plant Main Boiler Stack
Farooqabad, Pakistan
Static and dynamic structural analysis of the main boiler stack at Saba Power Plant, Farooqabad, to AISC, with stress analysis of the stack piping.
Challenge
Saba Power Company needed the integrity of the main boiler stack at its Farooqabad plant verified. Fluxiss carried out this work as engineering subcontractor.
Approach
Fluxiss analysed the stack under static and dynamic loads in STAAD.Pro to AISC, and analysed the boiler stack piping in CAESAR II to ASME B31.3.
Result
Stack integrity was checked under static and dynamic load analysis, along with the associated piping.
Scope of Work
- Static and dynamic stack analysis
- Stack piping stress analysis
Deliverables
- Structural analysis report
- Piping stress analysis
Similar projects

Refinery Steel Structure Design and Vetting: Gantry, Flare Stack Anchors and Waste Heat Recovery Boiler
Structural vetting and design at Pakistan Refinery Ltd. (PRL): JP-1 gantry, flare stack anchor bolts, a waste heat recovery boiler structure and more.

Steel Structures for a 65 KLPD Ethanol Fermentation and Distillation Plant
Design and detailed engineering of fermentation and distillation steel structures and civil foundations for a 65 KLPD ENA ethanol plant at Chashma.

Pipe Stress Analysis for a Large Water Treatment Plant with Pipe Sizes to DN1600
AutoPIPE stress analysis to BS EN 13480 across all piping systems at Thames Water's Becton plant, with pipe sizes up to DN1600.
Let's Build Something Great Together.
Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.