1,000 m³ Split Hopper Barge Design and Class-Approved Construction

1,000 m³ Split Hopper Barge Design and Class-Approved Construction

Karachi, Pakistan

Project Lead
Syed Nasir
Lead Consultant, Founder & CEO, Fluxiss
Discuss a similar project

Full naval architecture and fabrication of a 1,000 m³ split hopper dredging barge in Karachi, with first-time class approval and no structural revisions.

Challenge

A dredging barge with a bottom-opening hopper had to pass a full classification society structural review, including FEA of the hull, hopper doors and hinges in full and empty load conditions.

Approach

Fluxiss produced the hull form, hydrostatic and stability booklets, scantlings to class rules, FEA of structural members and class-approved construction drawings. The Karachi shipyard then laid the keel, erected the blocks and built the hopper door mechanism under progressive class surveys.

Result

The barge gained class approval first time with no structural revisions. Stability booklets were accepted and fabrication from keel to launch finished on schedule.

Scope of Work

  • Hull form and hydrostatics
  • Stability booklets
  • Scantling design and FEA
  • Fabrication and class surveys

Deliverables

  • Class-approved drawings
  • Stability booklets
  • Completed vessel

Codes & Tools

Classification society rulesRhinoMaxsurfFEA
Our Naval Architecture service