When you’re building a massive infrastructure project like Google’s KGX headquarters in London, the mechanical systems have to be flawless. Fluxiss was brought on to handle the detailed piping design and stress analysis for the diesel injection skid. This isn’t just about moving fuel; it’s about ensuring the backup power systems for one of the world’s most advanced buildings are resilient, vibration-resistant, and perfectly integrated into the broader structure.
The biggest hurdle at Google KGX was coordination. Designing a diesel injection skid involves tight tolerances. You are dealing with high-pressure lines where vibration and thermal stress can lead to leaks—or worse—system failure.
The primary difficulties included:
We didn’t just hand over a flat drawing. Our engineers worked directly with the client’s plant layout to build the entire system in AutoCAD Plant 3D. This allowed us to visualize every potential “clash” before it became an expensive problem on-site.
By identifying the stress points and interference issues in the virtual world, we saved the client significant time and money during the physical build.
Stop Guessing and Start Engineering
At Fluxiss, we believe piping design should make the contractor’s life easier, not harder. We don’t just “draw” pipes; we solve for the physics of the system. Whether you are building a data center in London or an industrial plant in the US, we provide the clean, useful drawings you need to get the job done right the first time.