CO2 Metering Skid Stress Analysis: Becton, Thames River, Europe

Due to client NDA commitments, the showcased projects represent only a portion of our work and not the full scope of what we’ve delivered.

At Fluxiss, we believe that true engineering excellence isn’t found in flashy jargon, but in the reliability of a system when it’s under pressure. We recently proved this on a massive scale by supporting “Becton” at one of the largest water treatment facilities in Europe, located in the Thames River region. This project wasn’t just about moving water; it was about the complex stress analysis of a CO2 Metering Skid and massive distribution lines that serve millions of people.

The Challenge: Controlling Stress in 1600DN Giant Pipes

The scale of the Becton project presented a physical challenge that few firms are equipped to handle. We were tasked with analyzing piping systems with diameters reaching 1600DN (64 inches). When you deal with pipes this large, every pound of pressure and every degree of temperature change is magnified.

The primary difficulties included:

  • High-Mass Dynamics: Managing the immense sustained weight of 1600DN piping filled with fluid.
  • Thermal Constraints: Even minor temperature shifts in the Thames River climate cause significant expansion in such large-diameter steel, which can lead to flange leaks or joint failure.
  • Tight Compliance: The system had to meet the strict safety standards of ASME B31.3 while integrating perfectly with existing Victorian-era infrastructure and modern treatment tech.

The Strategy: Cross-Checking Flexibility and Loads

Our approach to pipe engineering goes beyond just “running the numbers.” For the CO2 metering skid and the surrounding network, we focused on real-world site conditions. We didn’t just hand over a software-generated report; we embedded ourselves into the client’s team to ensure every simulation reflected the actual environment.

  1. Manual Stress Simulations: We performed detailed flexibility checks to ensure the system wouldn’t buckle under operational loads.
  2. Strategic Support Optimization: Instead of over-engineering with expensive mechanical joints, we optimized the support locations and expansion loops to allow the system to breathe naturally.
  3. Cross-Disciplinary Coordination: We verified that the loads being transferred to sensitive equipment—like the CO2 metering skids—were well within safe allowable limits.

The Result: Rapid Progress and Zero Field Errors

By delivering a comprehensive pipe stress analysis ahead of schedule, we allowed the construction team at Becton to move forward with total confidence.

  • Timeline Security: The project stayed on track because we identified and resolved potential flexibility issues during the design phase, preventing costly on-site “fixes.”
  • Operational Longevity: Our analysis significantly reduced future maintenance by ensuring that the 1600DN pipes and metering skids operate without excessive vibration or fatigue.
  • Scalable Success: We provided a solution that supports the treatment of water for millions of European residents, proving that simple, practical engineering is the best way to handle massive infrastructure.

Why Choose Fluxiss for Large-Scale Pipe Engineering?

Whether it’s a water treatment plant, an offshore rig, or a specialized gas skid, Fluxiss provides point-to-point pipe stress analysis that works. We don’t just solve equations; we provide the foundation for safe, cost-effective operations. If your project involves large-diameter piping or complex metering skids, you need a partner who understands the physical reality of the field.

Our Core Capabilities in Large-Scale Infrastructure:

  • Large Diameter Piping (1600DN+): Expert analysis for high-mass, high-flow systems.
  • Metering Skid Analysis: Protecting sensitive flow-measurement equipment from pipe stress.
  • ASME B31.3 & International Codes: Ensuring 100% compliance with industry standards.
  • Support & Loop Optimization: Cutting material costs while increasing system flexibility.

Consult With Our Engineering Team Today