Chilled Water Fan Coil System Design for a 832-Occupant Workers Building in Abu Dhabi
Abu Dhabi, UAE
Carrier HAP load analysis and 2-pipe fan coil sizing for a 7,212 m² G+3 workers building in Abu Dhabi: 651.4 kW coil load, 28.06 L/s chilled water.
Challenge
A G+3 workers' accommodation building of 7,212 m² with 832 occupants faced Abu Dhabi summer peaks of 42.4°C DB, with high internal gains from lighting, equipment and occupancy.
Approach
A four-floor 2-pipe fan coil model was built in Carrier HAP with individual space peaks per floor. Ventilation was set at 2.5 L/s per person plus 0.30 L/s·m² to ASHRAE 62.1, giving 4,244 L/s of outdoor air.
Result
Total coil load was 651.4 kW (September 14:00), peak zone sensible load 474.0 kW, supply airflow 42,579 L/s, heating load 105.2 kW and chilled water flow 28.06 L/s at 5.6°C ΔT.
Scope of Work
- Space-by-space cooling and heating loads
- Ventilation sizing
- Fan coil and CHW sizing
Deliverables
- HAP load report
- Design load breakdown
Similar projects

Building Services Pipe Stress Analysis for the Everton Stadium Project
White-label subcontract pipe stress analysis for the Everton Stadium project: mechanical, domestic and gas piping across movement joints up to 120 mm.
Pipe Stress Analysis of Plantrooms and 34-Floor Risers in a London Office Tower
Lead pipe stress analysis for The Leadenhall Building, London: plantrooms, floor pipework and risers to 34 floors, with support loads marked on drawings.

Large-Span Aluminium Trilite Space Frame Analysis for Event Use
STAAD.Pro analysis of a 2,380-node aluminium Trilite space frame under dead and wind loads, forming the basis for safe working load certification.
Let's Build Something Great Together.
Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.