BS EN 12056 drainage design for Baltic Hotel, Liverpool, from basement to 6th floor+, with SVP routing, backflow protection and FD60 fire collars.

Challenge

A multi-storey hotel needed drainage from basement to 6th floor and above, with soil and vent pipe routes coordinated on every floor, basement backflow protection and fire-rated penetrations under UK Building Regulations. Fluxiss carried out this work as engineering subcontractor.

Approach

Fluxiss designed the drainage to BS EN 12056 at 1:50 on A1. Internal water tanks were sized and located, SVP routes were boxed in, basement stub stacks were fitted with AAVs, and FD60 fire collars were specified at all penetrations. Bar, kitchen and guest room wet rooms were also detailed.

Result

Floor-by-floor drainage plans were issued for tender in April 2020, with a smoke vent combined clear area of 2.2 m².

Scope of Work

  • Basement, ground and upper floor drainage
  • SVP routing
  • Multi-backflow protection
  • Smoke vent sizing

Deliverables

  • Floor-by-floor drainage plans
  • IWT schedule
  • Fire collar and AAV specifications

Codes & Tools

BS EN 12056UK Building RegulationsAutoCAD
Our MEP Engineering service
Ready to Start Your Project?

Let's Build Something Great Together.

Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.