11 kW Rooftop Solar PV Design for a University Engineering Department

11 kW Rooftop Solar PV Design for a University Engineering Department

Karachi, Pakistan· 2021

Project Lead
Syed Nasir
Lead Consultant, Founder & CEO, Fluxiss
Discipline Lead
Mr. Ahsan
Renewable Energies Lead, Fluxiss
Discuss a similar project

HelioScope design of a 10.8 kWdc system for NED University's Mechanical Department: 17.65 MWh a year against a 12.77 MWh load, PR 82.8%.

Challenge

Rooms 72 to 79 of NED University's Mechanical Engineering Department faced chronic energy shortages, with an annual consumption of 12.77 MWh. Fluxiss carried out this work as engineering subcontractor.

Approach

A load analysis gave 35.49 kWh per day. String calculations set two strings of 10 Yingli 540 W modules on a 12 kW Delta inverter, and the system was modelled in HelioScope with a cost analysis.

Result

Annual production was 17.65 MWh at a performance ratio of 82.8%, for an estimated cost of about PKR 855,460 and a lifetime offset of 100 tons of CO2.

Scope of Work

  • Load analysis
  • String sizing
  • HelioScope system model
  • Cost analysis

Deliverables

  • HelioScope report
  • String calculations
  • Cost analysis

Codes & Tools

HelioScope
Our Renewable Energies service
Ready to Start Your Project?

Let's Build Something Great Together.

Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.