41.6 GWh Commercial Solar Plant Energy Yield Simulation in PVSyst
Pakistan· 2024
PVSyst v7.4.8 simulation for the TCP Godowns solar plant: 41.6 GWh a year to grid, P50 1,724 kWh/kWp and PR 82.29%.
Challenge
The TCP Godowns commercial solar plant needed a bankable estimate of annual energy at different probability levels. Fluxiss carried out this work as engineering subcontractor.
Approach
A full-year PVSyst v7.4.8 simulation was run with monthly irradiation of 128.5 to 219.2 kWh/m² and ambient temperatures of 18.8 to 30.5°C, reporting array and grid energy by month.
Result
Annual grid energy was 41,621,022 kWh at an average PR of 82.29%. Specific production was 1,724 (P50), 1,688 (P75) and 1,656 (P90) kWh/kWp/yr. Simulation dated 11 June 2024.
Scope of Work
- Monthly energy balance
- P50/P75/P90 production
- Loss analysis
Deliverables
- PVSyst simulation report
Similar projects

11 kW Rooftop Solar PV Design for a University Engineering Department
HelioScope design of a 10.8 kWdc system for NED University's Mechanical Department: 17.65 MWh a year against a 12.77 MWh load, PR 82.8%.

1.3 GWac Utility-Scale Solar PV Plant Design in Colorado
RatedPower design of Inovateus Solar's 1.33 GWac Kendall Ranch: 151 power stations, 40,678 trackers, 3.41 TWh in year 1 and PR 87.03%.

296 kW Elevated Commercial Rooftop Solar PV Design
PVSyst-simulated 296 kW elevated rooftop system with 501 × 590 W modules on chemically anchored steel structure, plus layout and wiring drawings.
Let's Build Something Great Together.
Partner with Fluxiss for engineering that holds up - under pressure, under load, under scrutiny.